Go to the gemba: see where the work happens

Go to where the work is done, look and ask, and turn what is seen into actions with an owner.

The task in figures

Gives you back
2.5 h a monthper team; today it takes 2.5 to 5.8 h a month
Elmira today
Does it
Frequency
Weekly
Who does it today
Engineer, Senior, Lead
How it is done today

What hurts today.

  • The findings stay in the notebook, and nobody follows them up.

  • People walk without knowing what to look at, and see the usual.

  • Moving the notes into the plan takes longer than the walk.

Problems are understood where they happen, not in a room. So whoever leads improvement walks the area every week: prepares what to look at (what is red, what is pending), observes, asks whoever does the work and writes down what they see. The value is in what happens next: if the findings stay in the notebook, the next walk finds the same thing.

Done today with

  • On the floor
  • Paper and whiteboard
  • Spreadsheet
  • Email and chat
  • BI dashboard
With Elmira

Each step, today and with Elmira.

Before you go, Elmira tells you on WhatsApp what is red and what is pending; on the floor you text her each finding, say it in a voice note or send its photo, and she turns it into an action with its owner, with the photo attached.

StepTodayWith Elmira
Prepare what to look at: what is red and what is pendingSpreadsheet, BI dashboard10 min – 20 minWhatsApp
Go and see, observe and ask whoever does the workOn the floorYour call
Write down what was seen, with photosPaper and whiteboard, On the floor10 min – 30 minWhatsApp
Turn each finding into an action with an ownerSpreadsheet, Email and chat15 min – 30 minWhatsApp

The conversation

Elmiracontinuous improvement agent
  1. Ana, continuous improvement engineer

    Elmira, I am going to the gemba in Packaging. What should I look at?

  2. In Packaging, “Cut Packaging’s waste” is critical and “Raise line 2’s OEE” is at risk. One action is overdue: Jorge Muñoz’s replacement of the sealer’s blades. The sealers are a good place to start.

  3. Ana, continuous improvement engineer

    Sealer 2 has no cleaning standard. Pedro Rojas should write it by the 23rd.

  4. Create the action “Write the cleaning standard for sealer 2”

    Goal: Cut Packaging’s waste

    Team: Packaging

    Responsible: Pedro Rojas

    Due on October 23, 2026

    ApproveReject
  5. Ana, continuous improvement engineer

    Approve

  6. Done: I created the action “Write the cleaning standard for sealer 2”.