Find and manage the bottleneck

Find the step that limits what the plant can produce and organize everything else to its pace: an hour lost there is lost for the whole plant.

The task in figures

Gives you back
It does not recur every month
Elmira today
Helps
Frequency
Per project
Who does it today
Senior
How it is done today

What hurts today.

  • What is easy gets improved, not what limits.

  • The bottleneck stops at lunch break.

  • Nobody watches the constraint every day.

Every plant has one step that limits how much it can deliver, and improving any other does not increase output. Managing it, as the theory of constraints proposes, means finding it by measuring capacity and inventory, making sure it never stops for lack of material, people or maintenance, scheduling the rest to its pace and, if it is still the constraint, raising its capacity. A senior leads it, and the hardest part is watching it every day.

Done today with

  • Expert
  • In-person meeting
  • On the floor
  • Spreadsheet
  • Email and chat
  • BI dashboard
With Elmira

Each step, today and with Elmira.

Finding the constraint is your work. Elmira sets down each measure to protect it as an action with its owner, records its output every day and tells you how it is doing.

StepTodayWith Elmira
Measure each step’s capacity and inventoryOn the floor, Spreadsheet1 h – 4 hStill by hand
Identify the constraintExpert, Spreadsheet30 min – 1.5 hStill by hand
Decide how to protect it: material, people and maintenanceIn-person meeting, Expert1 h – 3 hStill by hand
Turn each measure into an action with an ownerSpreadsheet, Email and chat15 min – 30 minWhatsApp
Schedule the rest of the flow to its paceIn-person meeting, Expert1 h – 3 hStill by hand
Follow its output and its stops every daySpreadsheet, BI dashboard10 min – 20 minWhatsApp

The conversation

No example conversation: the Obeyaka web app does it, or it comes later.