Set an indicator’s target

Propose, agree and record the target of each period, with the indicator’s history in view, so the traffic light means something.

The task in figures

Gives you back
0.2 h a monthper team; today it takes 0.4 to 0.8 h a month
Elmira today
Helps
Frequency
Quarterly
Who does it today
Engineer, Lead
How it is done today

What hurts today.

  • The target lives in an email or a slide deck, and the traffic light does not know it.

  • It is set without looking at the history: either it is impossible, or it is met by itself.

  • Everyone remembers a different target for the same month.

An indicator without a target does not say whether things go well or badly. Setting one means looking at its history (the baseline and the best ever achieved), proposing a figure that is demanding but possible, agreeing it with whoever answers for it and recording it period by period, with the point where it is at risk and the one where it is critical. When the target lives in an email or stays in a slide deck, the traffic light does not know it, and everyone remembers it differently.

Done today with

  • Expert
  • In-person meeting
  • Spreadsheet
  • BI dashboard
With Elmira

Each step, today and with Elmira.

On WhatsApp, Elmira brings you the indicator’s history to propose the target. In Obeyaka on the web you enter it once, fixed or progressive, it fills every period, and the traffic light colors itself against it.

StepTodayWith Elmira
Gather the indicator’s history and the best it has achievedSpreadsheet, BI dashboard20 min – 45 minWhatsApp
Propose a target that is demanding but possibleExpert, Spreadsheet20 min – 40 minStill by hand
Agree it with whoever answers for the indicatorIn-person meetingYour call
Record the target of each periodSpreadsheet10 min – 20 minObeyaka (web)
Set when it is at risk and when it is criticalSpreadsheet, Expert10 min – 20 minObeyaka (web)
Color the traffic light against the target, period by periodSpreadsheet10 min – 20 minAutomatic

The conversation

Elmiracontinuous improvement agent
  1. Ana, continuous improvement engineer

    Elmira, how did line 2’s OEE do last quarter?

  2. Over the 13 weeks it averaged 76.8. The best was week 33, at 81.2, and the worst week 29, at 71.5. The last 4 weeks average 78.9.

  3. Ana, continuous improvement engineer

    Then 80 is demanding but possible. I will enter it in the app for the quarter.